Munroe Creek Drain – 2017 – Middlesex Centre

Drainage, Excavation & Grading, Sewers

The Munro Creek Drain 2017 consists of approximately 289 lineal meters of open ditch construction and 32 meters realignment including quarry stone rip-rap bank protection and backfilling of the existing open ditch (367 meters), and 199 meters of 200mm to 450mm sewer pipe.

Location

Longwoods Road, County Road 2 – Middlesex Center.

Client:

The Municiaplity of Middlesex Centre, Ilderton, ON